Source |
The Intercept |
Identifiant |
457281 |
Date de publication |
2018-01-09 20:38:08 (vue: 2018-01-09 20:38:08) |
Titre |
Five Spills, Six Months in Operation: Dakota Access Track Record Highlights Unavoidable Reality - Pipelines Leak |
Texte |
>The Bakken system pipelines racked up at least eight leaks in 2017. Mariner East 2 and Rover saw drilling fluid spills before fuel even entered the lines.
|
Envoyé |
Oui |
Condensat |
2017 >the access appeared bakken before dakota drilling east eight entered even first five fluid fuel highlights intercept leak leaks least lines mariner months operation: pipelines post racked reality record rover saw six spills system track unavoidable |
Tags |
|
Stories |
|
Notes |
★★
|
Move |
|